Districtwide Improvements
-
Projects completed since 2014 bond and 2016 capital levy
Every Facility
- Wireless network and building exterior camera coverage was added at all district facilities.
- The district’s aging telephone system was upgraded and wireless computing devices were purchased.
Challenger
- Replaced the gym's sound system
- Upgraded the building’s fire panel
Columbia
- Replaced the gym’s sound system
- Replaced aged sections of the roof
- Conducted combustion analysis and rebuilt an aging boiler unit
Discovery
- A new multipurpose room and kitchen was constructed
- Installed digital heating and ventilation control systems
- Repainted the building’s aging exterior
Endeavour
- Replaced the gym’s sound system
- Conducted combustion analysis and rebuilt an aging boiler unit
Fairmount
- Replaced the gym’s sound system
- Added a new playground
- Replaced aged sections of the roof
Horizon
- Replaced the gym’s sound system
- Updated the school’s communication with a new readerboard
Lake Stickney
- Newly constructed and opened in September 2016
Mukilteo
- Replaced the gym’s sound system
- Replaced gym floor
- Filled in reading pits and installed new carpet in the library
Odyssey
- Replaced the gym’s sound system
Olivia Park
- Replaced the boiler
- Installed digital heating and ventilation control systems
- Replaced the gym’s sound system
Pathfinder Kindergarten Center
- Newly constructed and opened in September 2017
Picnic Point
- Replaced the gym’s sound system
- Replaced gym floor
- Replaced the roofing that covers the walkways
- Filled in reading pits and installed new carpet in the library
Serene Lake
- Replaced the gym’s sound system
- Replaced rooftop heating and ventilation unit
Explorer
- Replaced locker room flooring, lighting and fixtures
- Upgraded sound system in the gym
Harbour Pointe
- Expanded and renovated the music facilities and weight room
- Replaced deteriorated grass playing surfaces with safer artificial surface
- Improved building ramp to conform to ADA standards
Olympic View
- Constructed a new addition that includes an expanded gym, auxiliary gym, cardio/weight room, locker rooms, five new classrooms, band room, choir room, rehearsal rooms, instrument storage and a music library
- Replaced aged sections of the roof
Voyager
- Replaced deteriorated grass playing surfaces with safer artificial surface
- Replaced an aging transformer that provides the school’s main power supply
- Added an electronic readerboard
- Replaced aged sections of the roof
Aces
- Repurposed an existing portable building to accommodate science curriculum
- Replaced aged sections of the roof
- Portables were placed to accommodate capacity constraints related to our community's growth.
Kamiak
- Replaced aging boiler
- Provided a safety training room and team meeting room at the athletic fields
- Removed and replaced the worn track surface
- Replaced the aging artificial field surface
- Replaced the fire curtain in the auditorium
- Portables were placed to accommodate capacity constraints related to our community's growth.
Mariner
- Added a new Women’s locker room
- Replaced inefficient lighting and ventilation systems
- Removed and replaced the worn track surface
- Replaced the aging artificial field surface
- Portables were placed to accommodate capacity constraints related to our community's growth.