Districtwide Improvements

  • Projects completed since 2014 bond and 2016 capital levy

    Every Facility 

    • Wireless network and building exterior camera coverage was added at all district facilities.
    • The district’s aging telephone system was upgraded and wireless computing devices were purchased.

    Challenger

    • Replaced the gym's sound system
    • Upgraded the building’s fire panel

    Columbia

    • Replaced the gym’s sound system
    • Replaced aged sections of the roof
    • Conducted combustion analysis and rebuilt an aging boiler unit

    Discovery

    • A new multipurpose room and kitchen was constructed
    • Installed digital heating and ventilation control systems
    • Repainted the building’s aging exterior

    Endeavour

    • Replaced the gym’s sound system
    • Conducted combustion analysis and rebuilt an aging boiler unit

    Fairmount

    • Replaced the gym’s sound system
    • Added a new playground
    • Replaced aged sections of the roof

    Horizon

    • Replaced the gym’s sound system
    • Updated the school’s communication with a new readerboard

    Lake Stickney

    • Newly constructed and opened in September 2016

    Mukilteo

    • Replaced the gym’s sound system
    • Replaced gym floor
    • Filled in reading pits and installed new carpet in the library

    Odyssey

    • Replaced the gym’s sound system

    Olivia Park

    • Replaced the boiler
    • Installed digital heating and ventilation control systems
    • Replaced the gym’s sound system

    Pathfinder Kindergarten Center

    • Newly constructed and opened in September 2017

    Picnic Point

    • Replaced the gym’s sound system
    • Replaced gym floor
    • Replaced the roofing that covers the walkways
    • Filled in reading pits and installed new carpet in the library

    Serene Lake

    • Replaced the gym’s sound system
    • Replaced rooftop heating and ventilation unit

    Explorer

    • Replaced locker room flooring, lighting and fixtures
    • Upgraded sound system in the gym

    Harbour Pointe

    • Expanded and renovated the music facilities and weight room
    • Replaced deteriorated grass playing surfaces with safer artificial surface
    • Improved building ramp to conform to ADA standards

    Olympic View

    • Constructed a new addition that includes an expanded gym, auxiliary gym, cardio/weight room, locker rooms, five new classrooms, band room, choir room, rehearsal rooms, instrument storage and a music library
    • Replaced aged sections of the roof

    Voyager

    • Replaced deteriorated grass playing surfaces with safer artificial surface
    • Replaced an aging transformer that provides the school’s main power supply
    • Added an electronic readerboard
    • Replaced aged sections of the roof

    Aces

    • Repurposed an existing portable building to accommodate science curriculum
    • Replaced aged sections of the roof
    • Portables were placed to accommodate capacity constraints related to our community's growth.

    Kamiak

    • Replaced aging boiler
    • Provided a safety training room and team meeting room at the athletic fields
    • Removed and replaced the worn track surface
    • Replaced the aging artificial field surface
    • Replaced the fire curtain in the auditorium
    • Portables were placed to accommodate capacity constraints related to our community's growth.

    Mariner

    • Added a new Women’s locker room
    • Replaced inefficient lighting and ventilation systems
    • Removed and replaced the worn track surface
    • Replaced the aging artificial field surface
    • Portables were placed to accommodate capacity constraints related to our community's growth.