NOVEMBER 3, 2026, CAPITAL BOND FOR SCHOOLS 
A proposed $400 million school construction bond will appear on the Nov. 3 ballot and includes projects at every school in Mukilteo School District. At Odyssey Elementary School, the proposed projects focus on safety and security, technology infrastructure, replacement of aging building systems and playground. 

ODYSSEY ELEMENTARY SCHOOL 
Odyssey Elementary School was built in 2003. While building structures and most systems remain in good condition, work is needed to improve safety and security and upgrade some building systems. 

2026 CAPITAL BOND FOR SCHOOLS 
The volunteer Capital Bond Advisory Committee (CBAC) evaluates and prioritizes facility needs across the district to help ensure bond funding is focused on the highest-priority projects. For the 2026 bond, the committee recommended $400 million in projects from approximately $975 million in identified needs.  

The proposed bond includes the following improvements at Odyssey Elementary School:  

Building access controls – Add additional doors to the access control system and install door contacts on all exterior doors, allowing staff to monitor whether any exterior doors are open. 

Integrated door hardware – Install door hardware that can be locked from the inside using a thumb turn that clearly indicates whether it is locked or unlocked. The focus will be on spaces beyond standard classrooms, including the library, gym, common spaces, and offices. 

Building systems improvements – Upgrade aging HVAC system that will improve energy efficiency 

Replace playground – Replace play structure and surface to improve accessibility. 

PREVIOUS INVESTMENTS IN ODYSSEY ELEMENTARY SCHOOL 
Since 2014, the Mukilteo School District community has supported investments at Odyssey Elementary School to address aging infrastructure and provide students and staff with safe, functional, and reliable learning environments. These projects included:  

  • Addition of security cameras and emergency radios 
  • Addition of access Controls at main entry and egress points 
  • Addition of integrated door hardware for standard classrooms 
  • Installation of emergency communications systems 
  • Improvements to wireless connectivity 
  • Sand Field refresh